Custom curtains & blinds across Singapore

How to Specify Contract Curtains and Blinds

In the trade, contract curtains means curtains or blinds made for a non-domestic project to a written specification, rather than a ready-made pair from a shop. The phrase does not by itself mean a fire rating, a brand of motor, or a particular heading. If you need those, write them down.

Which product suits an office, a shop, a clinic or a hotel is on the commercial fit-out guide. This page is the specification and the quotation pack. Office glare, for example, is already explained in the office blinds guide. The schedule should record the result of that choice, not repeat the explanation.

What each opening should say

A schedule with one row per window, or per identical group, is enough. Drawings without a schedule leave the width and the product to be guessed.

Identify the opening. Level, room name, and a mark that matches the plan. Say if a long wall is one blind or several. Splitting a run is a glare choice and a maintenance choice. State it.

Size. Width, drop, and whether the blind sits inside the reveal or on the face of the wall. Inside or outside mount is that difference. Sizes on a tender drawing are for pricing. They are remeasured before cutting, because partitions and mullions move.

Product. Roller, venetian, vertical, curtain on a track, cubicle curtain, or an outdoor blind. Name the family if you are specifying from our range. Sunscreen rollers and blackout rollers are different lines.

Cloth. Name a fabric or a performance, not only a colour word. For sunscreen, state the openness and the colour, including the colour seen from outside if the landlord cares. Openness is explained in the openness and colour guide. For curtains, state heading, layers and whether blackout is the face cloth or a lining. Curtain headings keeps S-fold and pinch pleat from being treated as the same hardware.

Operation. Chain, wand, or motor. If it is a motor, say wired or rechargeable, which end the motor sits, and whether several blinds move together. Child-occupied rooms should not be left with a free loop. See blind cord safety.

Fixing. Concrete, a mullion, a ceiling grid, or a curtain box. A note that says “by contractor” with no substrate is how a bracket is offered to a plasterboard ceiling that cannot hold it.

Fire. If you need a test, name the standard and the level. “FR” and “fire rated” are not a specification. What those tests are, and what we could find in the Fire Code, is in fire-retardant curtains. Paste the clause into the tender. Ask for the test report with the sample, not after installation.

Sample and spares. On a large floor, require one approved bay before the rest is cut. Say how many spare panels or a spare blind you want for later damage. Hotels care about this because one room should match the next. The hotel page is that brief.

Cleaning. Say if the cloth must be wipeable, or if cubicle curtains must come off the track for laundry. Cubicle hardware is on the clinic page.

What to send for a quotation

A complete pack looks like this.

  • Plans and elevations, with the window marks used in the schedule.
  • Photos if the building exists. A tape in the photo helps. It does not replace the site measure.
  • The landlord or mall fit-out guide, including facade colour and anything that may not be fixed to the shopfront.
  • Any fire, insurer or operator specification, unedited.
  • The programme. When the glass and ceiling are finished, when you need installation, and whether that is after hours.
  • Access rules. Loading bay, lifts, permits, induction. We plan around the rules you send. We do not know them for every building.
  • Who will approve the quote. Main contractor, interior designer, or tenant. The trade page is the route for designers and contractors.

WhatsApp +66 64 528 5763 or use the contact page.

A drawing price and a measured price

A quotation from drawings is a budget. Openings that look identical on plan often differ once they are built. We measure on site before cloth or rails are cut, including on multi-room jobs. The hotel page states that for guest rooms. Tell us if a partition moves after that measure. A blind made to the old reveal will not fit.

Compare two quotations on the same rows. Watch for an unnamed fabric, supply-only when you thought installation was included, measurement excluded, motors excluded, and GST left off. Domestic per-metre rates in the curtain price guide and per-square-foot bands in the blinds price guide are a reference for homes. A fit-out is priced from the schedule. An HDB package on the packages page is for a flat layout, not for a tower floor.

Office schedules, without repeating the product guide

If the premises is an office, the schedule should already have answered the questions the office guide raises. Write the answers in.

Open-plan desks: sunscreen, with the openness and the external colour the landlord agreed.

Meeting rooms with a projector: blackout, and say whether side channels are required. A room with a TV may not need blackout. The office guide explains why.

Power and grouping for a whole facade, if you do not want a row of chains.

The same fabric family on the street elevation.

That is the specification. The reason for each line stays in the office guide so the two pages do not compete.

Common questions

What does contract curtains mean?

Curtains or blinds made for a non-domestic project to a written specification. It does not automatically mean a fire test or a motor. Add those in the schedule if you need them.

What should a tender say about fire performance?

The name of the test and the level, copied from the qualified person, the landlord or the operator. “Fire retardant” without a standard lets tenderers offer different tests. Ask for the report that names the fabric before you approve the sample.

Can you quote from drawings alone?

Yes, as a budget. We measure the built openings before production. If the glass or the partitions change after that visit, the sizes have to be taken again.

Who should receive the quotation?

Whoever will approve the cost and give site access. Say if that is the main contractor, the interior designer or the tenant, and send the fit-out rules with the drawings.

Chat on WhatsApp